The execution of the foundation slab is usually the responsibility of the investor and is carried out according to the precise instructions of the house contractor. To ensure high-quality execution, it is crucial to adhere to technical specifications and expert recommendations.

Foundation slab
INDIVIDUAL APPROACH
At Žiher Houses, we believe that a home is not just a building – it’s a reflection of you. That’s why we offer individual approaches that allow you to design your home completely to your specifications. Don’t compromise. Create a home that’s tailored perfectly to you – from the initial concept to the final detail.
From Slovenian log to Slovenian house!
The house, from log to final construction, is completely Slovenian – Slovenian wood is processed in our own plant, Žiher les, which ensures high quality and control over the entire production process.
The foundation of a quality and energy-efficient house is an advanced assembly of exterior and interior walls, ceilings, and roof structure. All elements are made from certified materials that ensure high thermal insulation, fire and earthquake resistance, and excellent sound protection. The construction is also designed with flood safety in mind – using moisture-resistant materials and appropriate details in the lower parts of the building. In case of damage, the modular design allows for quick and cost-effective rehabilitation without interfering with load-bearing elements.
Žiher houses are not only architecturally sophisticated – they are built according to a proven system that allows control, transparency, and the highest quality of living.
CONSTRUCTION PHASES
All construction phases include the organization and management of the construction site by the Žiher hiše contractor, including the logistics of transport and assembly of elements with a crane and scaffolding.
I. Construction phase: Assembly of structure and basic installations
- installation of external walls or the house’s envelope
- installation of internal walls and partitions
- installation of ceilings on the ground floor and towards the cold attic
- installation of the roof structure
- installation of the staircase structure
- roofing works
- sheet metal works
- windows and balcony doors (roof windows – depending on the model)
- concealed blinds
- entrance door
- facade work and facade cladding
- external and internal sills
- pull-down stairs
- inspection door
- construction site arrangement
Additionally, at the customer’s request (you can list the most frequent surcharges):
- chimney and fireplace insert
- auxiliary and garage doors
II. Construction phase: Electrical installations and final technical works
- electrical installation works
- installation of ventilation pipes/ventilation ductwork
- switching program
- water supply and sewage
- installation of sanitary elements
- rough development of rainwater drainage
- floor screeds
- painting works
- underfloor heating
- heat pump with outdoor and indoor unit
- ventilation system
Additionally, at the customer’s request (you can list the most frequent surcharges):
- preparation for photovoltaics
- preparation for air conditioning
- radiator – ladder
Preparations for photovoltaics and the implementation of a ventilation system are also included. In this phase, the house is already approaching its final appearance, with all the key technical elements.
III. Construction phase: Final interior finishing and preparation of the building for handover
- tiling works
- parquet laying
- internal stairs (in multi-story buildings)
- interior doors
- final cleaning of the building
- handover
Documentation
The basic offer includes the following documentation:
- project documentation for obtaining opinions and a building permit (DGD)
- projects for execution PZI
- PHPP calculation
- air tightness test
- project of execution works PID: if there is no change in the period between the preparation of the project for execution (PZI) and the handover of the building, the PZI is converted into PID free of charge.
| I. CONSTRUCTION PHASE – Assembly of the structure and basic installations | II. CONSTRUCTION PHASE – Electrical installations and final technical works | III. CONSTRUCTION PHASE – Final interior finishing and preparation for handover |
|---|---|---|
| Assembly of exterior walls (building envelope) | Electrical installation works | Ceramic works |
| Assembly of interior walls and partitions | Installation of ventilation ducts | Parquet flooring works |
| Assembly of ceilings (ground floor, cold attic barrier) | Switching program | Interior stairs (in multi-storey buildings) |
| Assembly of roof structure | Plumbing and sewage | Interior doors |
| Assembly of staircase structure | Installation of sanitary elements | Final cleaning of the building |
| Roofing works | Main rainwater drainage system | |
| Sheet metal works | Floor screeds | |
| Installation of windows and balcony doors (including roof windows – depending on model) | Painting works | |
| Under-plaster shading systems | Underfloor heating | |
| Entrance door | Heat pump (indoor and outdoor unit) | |
| Facade works and facade cladding | Ventilation system | |
| Exterior and interior window sills | ||
| Pull-down attic stairs | ||
| Inspection doors | ||
| Construction site arrangement |
Our experienced team is at your side every step of the way – from the first questions to the final selection of the best solution for your home. With expertise and a personal approach, we ensure a well-considered and safe decision. Click on Contact and get in touch with us.